10-2017
Uzbekistan Zero Liquid Discharge

Unidro has been awarded a contract for the design and supply of a large unit that will use membrane technologies to produce demineralized and cooling water for a fertilizer plant in Uzbekistan. Due to the severe constraints in liquid effluents discharge, a significant part of the Project is the ZLD section. It will include concentration of the main reverse osmosis reject in an additional RO pass, then evaporation of the reject in a forced circulation evaporator. The evaporator section, designed as per Unidro’s proprietary know-how, will produce a final waste with no less than 20% total solids content.

Two orders for Unidro on Bonny Island LNG, Nigeria
Two new contracts in the O&G business have been awarded to Unidro by the JV of Saipem (Italy), Chiyoda (Japan) and Daewoo (Korea) in the frame of the seventh Nigerian LNG train Project to be executed in Bonny Island, Nigeria.
Read more
CAREER DAY PMI 2021 – POLITECNICO MILAN
Are you a new Polimi graduate? Come and meet us at Career Day PMI, November 19 at Building B9 - Spazio convegni Carlo De Carli Via Durando 10, Milano Our team will be happy to talk about the many Job opportunities in our Group.
Read more
Back to the U.S.A.
Unidro is going to strengthen its presence into the U.S.A. by adding the fourth train to the existing Condensate Carbon Filter Package (supplied in 2015) in Cedar Bayou, TX, USA, Chevron Phillips’s Plant.
Read more