03-2017
Unidro completed the delivery of 6 packages for ENI Gas Field in Egypt

In June 2016 Unidro received two POs from Petrobel for the supply of 6 packages for ENI Zohr Gas Processing Plant in Egypt.
The development of Zohr, the largest Gas Field in the Mediterranean sea, is approached by ENI as a super fast-track project, targeting to produce treated gas within two years after the field discovery. In this frame, Unidro has been requested to deliver a water desalination unit, a condensate package and four lean amines filtration units in a challenging 7 to 9 months period. Today we can say the challenge has been won: all of the goods have been collected and shipped to site on schedule.

Two orders for Unidro on Bonny Island LNG, Nigeria
Two new contracts in the O&G business have been awarded to Unidro by the JV of Saipem (Italy), Chiyoda (Japan) and Daewoo (Korea) in the frame of the seventh Nigerian LNG train Project to be executed in Bonny Island, Nigeria.
Read more
CAREER DAY PMI 2021 – POLITECNICO MILAN
Are you a new Polimi graduate? Come and meet us at Career Day PMI, November 19 at Building B9 - Spazio convegni Carlo De Carli Via Durando 10, Milano Our team will be happy to talk about the many Job opportunities in our Group.
Read more
Back to the U.S.A.
Unidro is going to strengthen its presence into the U.S.A. by adding the fourth train to the existing Condensate Carbon Filter Package (supplied in 2015) in Cedar Bayou, TX, USA, Chevron Phillips’s Plant.
Read more