03-2018
“Supergiant” Zohr Gas Field is getting closer to Start-up

At Port Said, in Egypt, ENI is leading the Zohr Gas Project, one of the most challenging performances ever tried in the field of the large O&G projects: starting production of a gas field only 3 years after discovery.

Read more
01-2018
A challenging Commissioning in Algeria for Unidro Engineers

At Bir Rebaa Gas field in Algeria the new PWT system designed, supplied and installed by a three parties JV participated by Unidro is at commissioning phase.

Read more
11-2017
Unidro involved in Zohr Phase-2 (Ramp-Up to Plateau)

After fulfilling the superfast delivery of the packages for Zohr phase-1, Unidro has been renewed ENI’s trust and has been selected for the supply of 3 additional Lean Amine Filtration trains, and 1 additional Demineralized Water production unit based on membrane technology.

Read more
10-2017
Uzbekistan Zero Liquid Discharge

Unidro has been awarded a contract for the design and supply of a large unit that will use membrane technologies to produce demineralized and cooling water for a fertilizer plant in Uzbekistan.

Read more
09-2017
Uzbekistan Gas To Liquid

Unidro has been selected by Hyundai Engineering Co. (HEC) for the supply of a Side Stream Filtration unit for the Uzbekistan Gas to Liquid Project (UZGTL).

Read more
08-2017
Unidro will supply treatment systems for ENI FLNG

The Coral South LNG Project, for its size, quality of resources and geographical position, will transform Mozambique’s economy and is a further significant achievement for ENI operatorship capabilities.

Read more