At Port Said, in Egypt, ENI is leading the Zohr Gas Project, one of the most challenging performances ever tried in the field of the large O&G projects: starting production of a gas field only 3 years after discovery.
At Bir Rebaa Gas field in Algeria the new PWT system designed, supplied and installed by a three parties JV participated by Unidro is at commissioning phase.
After fulfilling the superfast delivery of the packages for Zohr phase-1, Unidro has been renewed ENI’s trust and has been selected for the supply of 3 additional Lean Amine Filtration trains, and 1 additional Demineralized Water production unit based on membrane technology.
Unidro has been awarded a contract for the design and supply of a large unit that will use membrane technologies to produce demineralized and cooling water for a fertilizer plant in Uzbekistan.
Unidro has been selected by Hyundai Engineering Co. (HEC) for the supply of a Side Stream Filtration unit for the Uzbekistan Gas to Liquid Project (UZGTL).
The Coral South LNG Project, for its size, quality of resources and geographical position, will transform Mozambique’s economy and is a further significant achievement for ENI operatorship capabilities.