During the years our Ecoservice workshop in Bergamo area has become the heart of Unidro systems assembly and factory testing, prior to shipment. As Unidro continued its growth, the original facility turned to be less adequate in terms of space and equipment and in the last few years temporary locations, as available in the nearby area, had to be added upon need.
Finally, in 2019 the decision was taken to look for a new location, in order to match the requirements of the more and more demanding Company business. The place has been identified in Levate (still Bergamo area) and the migration planned for H2 2020.
The transfer is now started and will be completed by the end of the year.
Once the migration is completed our E&I engineering department, software development team, quality control staff will be located in brand-new offices. Comfortable space for meeting clients members and inspectors is also available. Within the same building, a large shop area (more than twice the surface of the former facility) fully equipped to host the activities of piping fabrication, skid assembly and testing, control panel assembly, wiring and testing will allow for the execution of our work in full compliance with the quality, safety and health requirements, and a perfect job continuity among engineers, workers, suppliers and clients will be ensured.
This is an important step on the continuous path of Unidro to meet our Client’s expectation and to cope with a growing business. Moreover, in this very difficult period, this move wants to be a positive message to our staff, clients and suppliers, of confidence in the future.
08-2020
Unidro Workshop Moves to Levate (BG), North Italy